Q & A WITH THE DOB

               FUEL STORAGE & OIL TANK QUESTIONS  

OIL TANK ROOMS-EPOXY August 28, 2013

OIL TANK AFFADAVIT SEPTEMBER 26, 2013

OIL TANKS- FIREPROOF WALL ON OIL TANKS 7-16-2013

OIL TANK-TEMP TANKS 2-26-2013

OIL TANKS- TESTING REQUIREMENTS ON CONVERSION AND ROTH TANKS 2-13-2013

COMMON ISSUES FOR OIL TANKS AND EQUIPMENT UPGRADES 9-10-2012

OIL TANKS-CONVERSIONS 6-28-2012

OIL TANKS-BURNER CONVERSION 12-22-2011

                                   

       INSTALLATION/CONVERSIONS/CHANGE OF GRADE QUESTIONS

9-15-15 SEPT. MEETING WITH ROBERT DALY HIGHLIGHTS

CONVERSION-OIL TANKS-CONTAINMENT,FLANGES-VALVES ETC 9-18-2013

SOLID BRICKS VS. CONCRETE PAD August 28, 2013

CONDENSING BOILERS-HW SYSTEMS LWCO-MIXERS 6-13-2013

BOILER FEED LINE 5-29-13

HOUSKEEPING PAD- 1-11-2013

BOILER FLANGES ON BURNER-CHANGE OF GRADE 9-21-2012

COMMON ISSUES FOR OIL TANKS AND EQUIPMENT UPGRADES 9-10-2012

LWCO AFTER 2008 BOILER INSTALLATION MAY 24, 2012

INSTALLATION-LWCOS AND OIL TANKS 12-22-2011

INSTALLATION-VALVE, PLACEMENT & FLANGES 9-16-2011

INSTALL-HEADER & CHANGE OF GRADE REQUIREMENTS 7-8-2011

                         CHIMNEY QUESTIONS

9-15-15 SEPT. MEETING WITH ROBERT DALY HIGHLIGHTS

2-16-15 CHIMNEY AFFIDAVIT EMAILS FROM DOB

Chimney Affidavits under New Code 10-3-14

CHIMNEY-LETTER DOING CONVERSIONS 8-8-2013

CHIMNEY-LETTER DOING CONVERSIONS 8-8-2013

CHIMNEYS WHEN DOING DUAL FUEL 9-10-2012

                       BOILER INSPECTION QUESTIONS

INSPECTION-FIRE EXTINGUISHERS & SAND PAILS 3-11-2009

INSPECTION-STEAM CONNECTIONS FROM THE OUTLET 3-11-2009

INSPECTION-STEAM PRESSURE RELIEF VALVE 2-21-12

                       FIRST TEST FAILURE QUESTIONS

FIRST TEST FAIL-TAMPERED EQUIPMENT & RE-INSPECTION 10-2-13

FIRST TEST FAIL-COMBUSTION AIR & RE-INSPECTION 5-28-2013

FIRST TEST FAIL-VENTILATION 2-27-2013

                        LAA FILING QUESTIONS

LAA-PROPOSED WORDING IN NEXT CODE FOR LOBI’S 6-4-2013

LAA FILING OIL WITH 800MBTUH 4-13-2011